NYC SCA Mott Haven Campus

Scope of Project

-    Rig chillers to roof and pipe chillers
-    Rig boilers to roof and pipe boilers
-    Install over 3,000 ft refrigerant and drain pipe
-    Fan coil from 8" Vic down to 2 ½"